Your production.
And where it stands right now.
From order to shipment as one continuous flow — not as a list of individual statuses. One glance is enough to see where material is missing, the line is at a standstill, scrap is being created, and when the next maintenance is due.
Four questions — answered directly
on the line.
Instead of checking five systems, the steps themselves carry their status. You can see the state of production without asking.
Where is material missing?
Steps waiting for parts are marked — before the line comes to a standstill.
Where is the line at a standstill?
Waiting times and bottlenecks are shown in red — including what is waiting behind them.
Where is scrap created?
Inspection steps with conspicuous error rates stand out immediately — with reference to the cause.
When is maintenance due?
Machines report upcoming maintenance — planable instead of an expensive outage.
The node "Material"
is red.
A supplier part is missing between order and production. The graph shows it immediately — including what is waiting because of it: the ongoing production, assembly, and a promised delivery date.
- Cause visible: missing supplier part, not the machine.
- Consequences visible: which steps and which deadline are affected.
- Action possible: reorder directly from the node.
- Status
- Waiting for part
- Waiting time
- 3 days
- Blocked
- Production · Assembly
- Missing
- Supplier part (vendor)
- Risk
- Delivery date slips