Overview / Business Graph / Production Graph
14 / Production

Your production.
And where it stands right now.

From order to shipment as one continuous flow — not as a list of individual statuses. One glance is enough to see where material is missing, the line is at a standstill, scrap is being created, and when the next maintenance is due.

// Production Graph · Order → Shipment 1 bottleneck detected
Order
Material missing
Production
Maintenance
Inspection
Assembly
Shipment
Material missing / line stopped Ready for shipment Production step
What the graph answers

Four questions — answered directly
on the line.

Instead of checking five systems, the steps themselves carry their status. You can see the state of production without asking.

Where is material missing?

Steps waiting for parts are marked — before the line comes to a standstill.

Where is the line at a standstill?

Waiting times and bottlenecks are shown in red — including what is waiting behind them.

Where is scrap created?

Inspection steps with conspicuous error rates stand out immediately — with reference to the cause.

When is maintenance due?

Machines report upcoming maintenance — planable instead of an expensive outage.

The bottleneck in detail

The node "Material"
is red.

A supplier part is missing between order and production. The graph shows it immediately — including what is waiting because of it: the ongoing production, assembly, and a promised delivery date.

  • Cause visible: missing supplier part, not the machine.
  • Consequences visible: which steps and which deadline are affected.
  • Action possible: reorder directly from the node.
// BOTTLENECK · MATERIAL
Status
Waiting for part
Waiting time
3 days
Blocked
Production · Assembly
Missing
Supplier part (vendor)
Risk
Delivery date slips
Your production as a graph

We make your line visible.

In 30 minutes, we map one of your production lines as a graph — and show where it stands.